SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.3.1. The mechanisms of non-governmental control over the construction of facilities have been improved through designer and technical supervision, independent engineering control, the involvement of accredited laboratories and inspection authorities, and tougher liability of the entities exercising such control
Progress in the implementation of measures as of
22.12.2024
measures, the implementation of which as of
30.09.2024
2
2
Not started
Measures implemented (fully and partially) -
0 (
0%)