SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.10.3. An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction
Progress in the implementation of measures as of
25.02.2026
2 |
40%
2 |
40%
1 |
20%
5
ImplementedPartially implementedNot implemented
Measures implemented (fully and partially) -
4 (80%)
№
Name of the ESR
Name of the measure
The main implementer
Monitoring results (latest)
Status
% of measures implemented (fully and partially)
Direction 2.5.
Construction, land relations, and infrastructure
80%
4 /
5
Problem 2.5.10.
Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
80%
4 /
5
3.1
ОСР
2.5.10.3.
An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction