SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

ESR: 2.5.10.3. An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction

Progress in the implementation of measures as of 25.02.2026
2 2 1
5
Implemented Partially implemented Not implemented
Measures implemented (fully and partially) - 4 (80%)
Selected filters:
Заходи, які підлягають виконанню
Clean the filter
Name of the ESR Name of the measure The main implementer Monitoring results (latest) Status % of measures implemented (fully and partially)
Direction 2.5. Construction, land relations, and infrastructure
80% 4 / 5
Problem 2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
80% 4 / 5
3.1 ОСР 2.5.10.3. An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction 2.5.10.3.1 Developing and signing documentation for the implementation of the tool for digital management of the rebuilding (modernization) of Ukraine, which will ensure public access to an interactive map of projects, including those involving the rebuilding (modernization) of Ukraine, with information about competitive bidding processes completed, contracts signed, contractors and current progress of construction all over Ukraine, making it possible to monitor the progress of renovations and construction and avoid overlapping operations at the same sites Ministry for Communities and Territories Development of Ukraine The measure was not implemented on time and in full Implemented
80% 4 / 5
3.2 2.5.10.3.2 Conducting pilot operation of the digital management tool indicated in subclause 2.5.10.3.1, adjusting it (if needed), and putting it into commercial operation. Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
3.3 2.5.10.3.3 Ensuring constant operation (with public access) and updating of the interactive map of projects, particularly projects to rebuild (modernize) Ukraine, with information about competitive bidding processes completed, contracts signed, contractors and current progress of construction all over Ukraine, making it possible to monitor the progress of repairs and construction Ministry for Communities and Territories Development of Ukraine The measure was implemented on time, but partially Partially implemented
3.4 2.5.10.3.4 Developing technical documentation for integration of the interactive map of projects, including projects to rebuild (modernize) Ukraine, with the Unified State Electronic System in Construction Ministry for Communities and Territories Development of Ukraine The measure was not implemented on time and in full Implemented
3.5 2.5.10.3.5 Conducting pilot operation and performing the commercial launch of the interactive map of projects, including projects to rebuild (modernize) Ukraine, integrated with the Unified State Electronic System in Construction State Agency for Restoration and Infrastructure Development of Ukraine The measure was implemented late and partially Partially implemented