SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.10.4. Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys
Progress in the implementation of measures as of
03.04.2025
measures, the implementation of which as of
31.12.2024
2 |
33.3%
2 |
33.3%
1 |
16.7%
1 |
16.7%
6
ImplementedIn progressNot implementedNot started
Measures implemented (fully and partially) -
2 (
33.3%)
№
Name of the ESR
Name of the measure
The main implementer
Monitoring results (latest)
Status
% of measures implemented (fully and partially)
Evaluation of achievement of ESR
Середній рівень ОСР
Direction 2.5.
Construction, land relations, and infrastructure
33.3%
2 /
6
21.6%
Problem 2.5.10.
Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
33.3%
2 /
6
45.4%
4.1
ОСР
2.5.10.4.
Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys