SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.10.4. Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys
Progress in the implementation of measures as of
25.02.2026
1 |
16.7%
4 |
66.7%
1 |
16.7%
6
ImplementedPartially implementedNot implemented
Measures implemented (fully and partially) -
5 (83.3%)
№
Name of the ESR
Name of the measure
The main implementer
Monitoring results (latest)
Status
% of measures implemented (fully and partially)
Direction 2.5.
Construction, land relations, and infrastructure
83.3%
5 /
6
Problem 2.5.10.
Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
83.3%
5 /
6
4.1
ОСР
2.5.10.4.
Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys