SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

ESR: 2.5.10.5. Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety

Progress in the implementation of measures as of 22.11.2024
measures, the implementation of which as of 30.09.2024
1 2
3
Partially implemented In progress
Measures implemented (fully and partially) - 1 ( 33.3%)
Name of the ESR Name of the measure The main implementer Monitoring results (latest) Status % of measures implemented (fully and partially) Evaluation of achievement of ESR Середній рівень ОСР
Direction 2.5. Construction, land relations, and infrastructure
33.3% 1 / 3
0.0%
Problem 2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
33.3% 1 / 3
0.0%
5.1 ОСР 2.5.10.5. Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety 2.5.10.5.1 Ensuring the operation of all WIM systems deployed on motor roads, including repairs of WIM systems that are out of order State Agency for Restoration and Infrastructure Development of Ukraine The measure was implemented on time, but partially Partially implemented
33.3% 1 / 3
0.0%
5.2 2.5.10.5.2 Certificates of entry into operation have been signed, and at least 45 new WIM systems are functioning. State Agency for Restoration and Infrastructure Development of Ukraine There is progress in the implementation of the measure In progress
5.3 2.5.10.5.3 Publication on the official website of the State Service of Ukraine for Transport Safety of information about violations of dimension and weight limits as well as sanctions imposed for the relevant violations, particularly administrative penalties State Service of Ukraine for Transport Safety There is progress in the implementation of the measure In progress