SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.10.5. Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety
Progress in the implementation of measures as of
22.01.2025
measures, the implementation of which as of
30.09.2024
2
1
3
In progress
Not started
Measures implemented (fully and partially) -
0 (
0%)
№ | Name of the ESR | Name of the measure | The main implementer | Monitoring results (latest) | Status | % of measures implemented (fully and partially) | Evaluation of achievement of ESR | Середній рівень ОСР |
---|---|---|---|---|---|---|---|---|
Direction 2.5. Construction, land relations, and infrastructure |
0%
0 /
3
|
0.0% | ||||||
Problem 2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes |
0%
0 /
3
|
0.0% | ||||||
5.1 | ОСР 2.5.10.5. Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety | 2.5.10.5.1 Provision of operability of all WIM systems located on the public roads, commissioned before the martial law period in Ukraine in acc. with the Order of the President of Ukraine as of February 24, 2022 no.64 ‘On introduction of martial law in Ukraine’, excluding ones located in the occupied territories and in territories adjacent to combat line (upon availability of funds) | State Agency for Restoration and Infrastructure Development of Ukraine | There is progress in the implementation of the measure |
0%
0 /
3
|
0.0%
|
|
|
5.2 | 2.5.10.5.2 Commissioning and ensuring operation of at least 45 new WIM sustems (upon availability of funds) | State Agency for Restoration and Infrastructure Development of Ukraine | ||||||
5.3 | 2.5.10.5.3 Publication on the official website of the State Service of Ukraine for Transport Safety of information about violations of dimension and weight limits as well as sanctions imposed for the relevant violations, particularly administrative penalties | State Service of Ukraine for Transport Safety | There is progress in the implementation of the measure |