SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

Problem: 2.5.9. Excessive concentration of powers within the central executive authority implementing public policy on land relations causes conflicts of interests and massive abuses

Progress in the implementation of measures as of 21.11.2024
measures, the implementation of which as of 30.09.2024
1 1 1
3
Implemented Not implemented Not started
Measures implemented (fully and partially) - 1 ( 33.3%)
Name of the ESR Name of the measure The main implementer Monitoring results (latest) Status % of measures implemented (fully and partially) Evaluation of achievement of ESR Середній рівень ОСР
Direction 2.5. Construction, land relations, and infrastructure
33.3% 1 / 3
0.0%
Problem 2.5.9. Excessive concentration of powers within the central executive authority implementing public policy on land relations causes conflicts of interests and massive abuses
33.3% 1 / 3
0.0%
1.1 ОСР 2.5.9.1. The powers to dispose of state-owned land, control the use and protection of land, regulate land management, and maintain the State Land Cadaster are divided between separate agencies 2.5.9.1.1 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing to stipulate: the procedure by which the State Service for Geodesy, Cartography, and Cadaster shall delegate to self-regulatory land management and topography-geodesy organizations the powers to carry out professional certification of land management engineers and geodesic engineers and to revoke their professional certificates in the instances prescribed by law, as well as to monitor the delegated powers Ministry of Agrarian Policy and Food of Ukraine The measure has not been implemented Not implemented
33.3% 1 / 3
0.0%
1.2 2.5.9.1.2 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft resolution of the Cabinet of Ministers of Ukraine defining: delegation by the State Service for Geodesy, Cartography, and Cadaster to self-regulatory land management and topography-geodesy organizations that have an internal certification procedure and the code of professional conduct the powers to carry out professional certification of land management engineers and geodesic engineers and to revoke their professional certificates in the instances prescribed by law, as well as to monitor the delegated powers Ministry of Agrarian Policy and Food of Ukraine Implementation of the measure has not started Not started
1.3 2.5.9.1.3 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law providing for the possibility of: 1) a state enterprise that has perpetual tenancy over agricultural land plots independently leasing out some of its land plots exclusively through an auction, without suspending its perpetual tenancy right; 2) transformation of a state enterprise that has perpetual tenancy over land plots measuring over 100 hectares into a limited liability company 100 percent of whose authorized capital stock (equity) belongs to the state, with the land plots to be leased out to the newly formed enterprise without holding an auction, with the possibility of subleasing such land plots exclusively through an auction. Ministry of Agrarian Policy and Food of Ukraine The measure was implemented on time and in full Implemented