Feedback from the public

Measure

1.1.1.5.4.(10). Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)

Measure status:

Implemented

Actual execution date:

31.12.2023

The measure is aimed at achieving ESR:

1.1.1.5. Sufficient funding and other essential resources are allocated for the needs of shaping and implementing the anticorruption policy

Problem solving:

1.1.1. The state anticorruption policy is not always based on complete, objective, and reliable data; The efforts of different government agencies, local self-government bodies, and the public are not sufficiently coordinated

Deadlines:

01.03.2023 - 31.12.2023

Responsible implementors (authorities):

The main implementer: Ministry of Internal Affairs of Ukraine

Sources of funding:

state budget

Volumes of financing (thousand UAH):

within the established budget allocations for the relevant year

Performance indicator:

Financial and economic calculations of the needs have been performed.

Implementing status

Progress/Result of implementation:

According to the Ministry of Internal Affairs of Ukraine, as of December 31, 2023, "financial and economic calculations were performed and feasibility studies were developed for the tasks (projects) of the Sectoral Programme for Information Technology Development of the System of the Ministry of Internal Affairs of Ukraine and Central Executive Authorities, whose activities are directed and coordinated by the Cabinet of Ministers of Ukraine through the Minister of Internal Affairs of Ukraine, namely:

"Modernisation of the digital PBX of the Ministry of Internal Affairs with the expansion of functionality and call capabilities";

"Measures to determine the technology and develop proposals for the introduction of a unified multi-zone digital radio communication system in the relevant frequency bands for special users of the radio frequency spectrum of Ukraine of the Ministry of Internal Affairs of Ukraine and central executive authorities";

"Modernisation of the Unified Сentral Departmental Electronic Communications Network of the Ministry of Internal Affairs of Ukraine and the core of the Ministry's network, including ensuring fault tolerance with regard to its further integration into the National Telecommunications Network (NTM)";

"Implementation of secure connections between existing departmental IP telephony networks of central executive authorities in the system of the Ministry of Internal Affairs of Ukraine, including video conferencing";

"Construction of a secure system of Wi-Fi wireless communication and access to the services of the Unified Сentral Departmental Electronic Communications Network of the Ministry of Internal Affairs of Ukraine";

"Modernisation of the central Internet access node, including cloud-based protection of information resources of the Ministry of Internal Affairs of Ukraine";

"Creation of special electronic communication systems of the unified information system of the Ministry of Internal Affairs of Ukraine for the transmission (processing) of classified and non-public information".

In addition, the Ministry of Internal Affairs of Ukraine remains a co-implementer of the measure 1.4.2.2.2 of the SACP and, if necessary, should be involved in providing relevant proposals to the main implementer on financial and economic calculations and development of a feasibility study.

Monitoring results (quarterly):

15.02.2024:
The measure was implemented on time and in full
08.11.2023:
There is progress in the implementation of the measure
10.08.2023:
Implementation of the measure has started on time

Key sources of assessment:

Additional sources of information: