1.1.1.5. Sufficient funding and other essential resources are allocated for the needs of shaping and implementing the anticorruption policy

Problem solving:

1.1.1. The state anticorruption policy is not always based on complete, objective, and reliable data; The efforts of different government agencies, local self-government bodies, and the public are not sufficiently coordinated

Deadlines for all measures within ESR

01.03.2023 - 31.12.2025

Implementation of SACP measures within ESR

Total number of measures – 50
20 5 5 13 7
Implemented Partially implemented In progress Not implemented Not started

Implementation of SACP measures within the scope of the Problem by main main performers

National Agency on Corruption Prevention

75%
4

Ministry of Finance of Ukraine

50%
2

Ministry of Digital Transformation of Ukraine

0%
2

Ministry of Defenсe of Ukraine

0%
2

Ministry of Social Policy of Ukraine

100%
2

Ministry of Agrarian Policy and Food of Ukraine

0%
2

Summarized general information on Measures

Name of the measure The main implementer Co-implementors Performance indicator Monitoring results (latest) Статус
1 1.1.1.5.1 Annually formulating the performance indicators of Budget Program 6331030 “Implementation of Anticorruption Strategies” aimed at implementing the Program activities National Agency on Corruption Prevention Performance indicators of Budget Program 6331030 “Implementation of Anticorruption Strategies” for 2024 and 2025 have been formulated.
The measure was implemented on time and in full
Implemented
2 1.1.1.5.2 Determining the tentative scope of budget allocations required for the relevant planning year for the implementation of activities of Budget Program 6331030 “Implementation of Anticorruption Strategies” National Agency on Corruption Prevention The tentative scope of budget allocations as part of Budget Program 6331030 “Implementation of Anticorruption Strategies” has been determined.
The measure was implemented on time and in full
Implemented
3 1.1.1.5.3 Approving sufficient financial resources within the State Budget of Ukraine for proper implementation of the activities outlined in Budget Program 6331030 “Implementation of Anticorruption Strategies” Ministry of Finance of Ukraine Національне агентство з питань запобігання корупції The annual amount of funding as part Budget Program 6331030 “Implementation of Anticorruption Strategies” is 100 percent of the budget requested by the National Agency for the relevant year.
There is no progress in the implementation of the measure
In progress
4 1.1.1.5.4 (16) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Anti-Corruption Bureau of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
5 1.1.1.5.4 (22) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Statistics Service of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
6 1.1.1.5.4 (17) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Economic Security Bureau of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
7 1.1.1.5.4 (18) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Asset Recovery and Management Agency Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
8 1.1.1.5.4 (19) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Security Service of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
9 1.1.1.5.4 (20) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Property Fund of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
10 1.1.1.5.4 (21) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Antimonopoly Committee of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
11 1.1.1.5.4 (23) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Administration of State Service of Special Commucations and Information Protection of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time, but partially
Partially implemented
12 1.1.1.5.4 (24) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Service of Ukraine for Geodesy, Cartography and Cadastre Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
13 1.1.1.5.4 (25) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Tax Service of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
14 1.1.1.5.4 (26) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Regulatory Service of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
15 1.1.1.5.4 (27) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Agency for Restoration and Infrastructure Development of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time, but partially
Partially implemented
16 1.1.1.5.4 (28) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Health Service of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
17 1.1.1.5.4 (29) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Fund for Social Protection of Persons with Disabilities Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
18 1.1.1.5.4 (30) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Agency for Higher Education Quality Assurance Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
19 1.1.1.5.4 (31) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Commission on Securities and Stock Market Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
20 1.1.1.5.4 (14) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) State Bureau of Investigation Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
21 1.1.1.5.4 (1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Agency on Corruption Prevention Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
22 1.1.1.5.4 (2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Digital Transformation of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
23 1.1.1.5.4 (3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Finance of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
24 1.1.1.5.4 (4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry for Communities and Territories Development of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
25 1.1.1.5.4 (5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Justice of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
26 1.1.1.5.4 (6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Economy of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
27 1.1.1.5.4 (7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Agrarian Policy and Food of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
28 1.1.1.5.4 (9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Defenсe of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
29 1.1.1.5.4 (10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Internal Affairs of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
30 1.1.1.5.4 (11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Health of Ukraine Financial and economic calculations of the needs have been performed.
The measure was not implemented on time and in full
Implemented
31 1.1.1.5.4 (12) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Education and Science of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time and in full
Implemented
32 1.1.1.5.4 (13) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Prosecutor General’s Office of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented late and partially
Partially implemented
33 1.1.1.5.4 (8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) Ministry of Social Policy of Ukraine Financial and economic calculations of the needs have been performed.
The measure was not implemented on time and in full
Implemented
34 1.1.1.5.4 (15) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3) National Police of Ukraine Financial and economic calculations of the needs have been performed.
The measure was implemented on time, but partially
Partially implemented
35 1.1.1.5.5 (16) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Enterprise "Medical Procurement of Ukraine" Financial and economic calculations of the needs have been performed.
There is no progress in the implementation of the measure
In progress
36 1.1.1.5.5 (15) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) National Health Service of Ukraine Financial and economic calculations of the needs have been performed.
Implementation of the measure has not started
Not started
37 1.1.1.5.5 (14) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Regulatory Service of Ukraine Financial and economic calculations of the needs have been performed.
There is no progress in the implementation of the measure
In progress
38 1.1.1.5.5 (13) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Service of Ukraine for Geodesy, Cartography and Cadastre Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
39 1.1.1.5.5 (12) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Agency of Ukraine for the Development of Melioration, Fisheries and Food Programs Financial and economic calculations of the needs have been performed.
The measure was implemented late and partially
Partially implemented
40 1.1.1.5.5 (11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Service of Geology and Mineral Resources of Ukraine Financial and economic calculations of the needs have been performed. Not started
41 1.1.1.5.5 (10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Agency of Water Resources of Ukraine Financial and economic calculations of the needs have been performed.
Implementation of the measure has not started
Not started
42 1.1.1.5.5 (9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) State Forest Resources Agency of Ukraine Financial and economic calculations of the needs have been performed.
There is no progress in the implementation of the measure
In progress
43 1.1.1.5.5 (8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Asset Recovery and Management Agency Financial and economic calculations of the needs have been performed. Not started
44 1.1.1.5.5 (7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Health of Ukraine Financial and economic calculations of the needs have been performed.
The measure was not implemented on time and in full
Implemented
45 1.1.1.5.5 (6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Social Policy of Ukraine Financial and economic calculations of the needs have been performed.
The measure was not implemented on time and in full
Implemented
46 1.1.1.5.5 (5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Defenсe of Ukraine Financial and economic calculations of the needs have been performed. Not started
47 1.1.1.5.5 (4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Environmental Protection and Natural Resources of Ukraine Financial and economic calculations of the needs have been performed.
Implementation of the measure has not started
Not started
48 1.1.1.5.5 (3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Agrarian Policy and Food of Ukraine Financial and economic calculations of the needs have been performed.
The measure has not been implemented
Not implemented
49 1.1.1.5.5 (2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) Ministry of Digital Transformation of Ukraine Financial and economic calculations of the needs have been performed.
Implementation of the measure has started on time
In progress
50 1.1.1.5.5 (1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1) National Agency on Corruption Prevention Financial and economic calculations of the needs have been performed. Not started

Indicators of achievement of ESR

Total number of indicators – 2

Indicators fully achieved – 0

Partially achieved indicators – 0

Indicators with a score of 0% – 2

Summarized general information about Achievement Indicators

Indicators Weight (%)
1 the National Agency is implementing the budget program 6331030 “Implementation of Anticorruption Strategies”; 10%
2 in 2024 and 2025, the amount of funding under the budget program 6331030 “Implementation of Anticorruption Strategies” is as follows:
a) 100 percent of the budget requested by the National Agency for the relevant year (90 percent);
b) more than 90 percent of the budget requested by the National Agency for the relevant year (75 percent);
c) more than 80 percent of the budget requested by the National Agency for the relevant year (60 percent);
d) more than 70 percent of the budget requested by the National Agency for the relevant year (45 percent);
e) more than 60 percent of the budget requested by the National Agency for the relevant year (30 percent);
f) more than 50 percent of the budget requested by the National Agency for the relevant year (15 percent).
90%