Feedback from the public

ESR

2.5.1.3. The Unified Electronic Urban Development Cadaster has been integrated with other registers, cadasters, and databases. Control over the currency and accuracy of data in the registers has been ensured, and responsibility for the timeliness and accuracy of the information entered into them has been established

Problem solving:

2.5.1. The lack of publicity surrounding the information in the field of urban development and land management fosters corruption and makes construction in violation of the law possible.

Deadlines for all measures within ESR

01.01.2024 - 31.03.2025

Implementation of SACP measures within ESR

Total number of measures – 2

Implementation of SACP measures within the scope of the Problem by main main performers

Summarized general information on Measures

Name of the measure The main implementer Co-implementors Performance indicator Monitoring results (latest) Статус
1 2.5.1.3.1 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to select laws on the creation and operation of a unified electronic urban development cadaster, which:
1) provides for the creation of a unified electronic urban development cadaster with unified (standard) requirements for the content of all registers on the same cartographic substrate;
2) designates the government agency responsible for creating and maintaining (administering) the unified electronic urban development cadaster;
3) defines the powers and officers responsible for transferring data to populate the unified electronic urban development cadaster, as well as the responsibility of such officers for the accuracy and relevance of such information and its timely uploads;
4) ensures public access to the unified electronic urban development cadaster (other than classified information);
5) defines the list and procedure for providing administrative services in the sector of urban development with the help of the platform of the unified electronic urban development cadaster, particularly through the Unified State Electronic System in Construction;
6) provides for the creation of urban development documentation in digital vector form and stipulates that urban development documentation shall take effect only from the time of its registration in the unified electronic urban development cadaster and assignment of a spatial index, as well as specifies the time frames and officers responsible for populating this cadaster with current urban development documentation (particularly the documentation adopted before the cadaster was instituted);
7) provides for data integration of the unified electronic urban development cadaster, the State Land Cadaster, the State Register of Real Rights to Immovable Property, the electronic register of cultural heritage sites, the State Forest Cadaster, the State Cadaster of Territories and Sites of the Nature Reserve Fund, and other essential information resources of the state, the list of which shall be compiled by the Cabinet of Ministers of Ukraine in the Procedure for Maintaining the Unified Electronic Urban Development Cadaster;
8) stipulates that urban development conditions and restrictions shall be generated automatically by software tools of the unified electronic urban development cadaster, along with specific kinds of permits.
Ministry for Communities, Territories and Infrastructure Development of Ukraine The draft law has been submitted to the Parliament of Ukraine. Not started
2 2.5.1.3.2 Putting into operation the unified electronic urban development cadaster, whose tools ensure:
1) automation and provision of the legislatively prescribed list of administrative services in the sector of urban development, which have to be provided through the platform of the unified electronic urban development cadaster;
2) population of the unified electronic urban development cadaster with current urban development documentation (particular that adopted prior to the launch of the cadaster) and assignment of a spatial index to this documentation;
3) maintenance of the state register of urban development documentation as part of the unified electronic urban development cadaster and entry of urban development documentation into the unified electronic urban development cadaster, assignment of a spatial index, and granting free access to this documentation (other than classified information);
4) mutual exchange and integration of data among the unified electronic urban development cadaster, the State Land Cadaster, the State Register of Real Rights to Immovable Property, the electronic register of cultural heritage sites, the State Forest Cadaster, the State Cadaster of Territories and Sites of the Nature Reserve Fund; geospatial data about the territory, administrative-territorial units; databases of ecological and forest cadasters, geotechnical conditions; data on facilities of the engineering and transport infrastructure, existing and proposed utility networks, line facilities of the energy infrastructure, distribution of capacities of utility networks, available unclaimed capacity, and technical specifications issued; geospatial data of technical inventory and registration of immovable properties, the unified register of addresses;
5) the ability to automatically generate urban development conditions and restrictions as well as specific kinds of permits by submitting an online application through the platform of the unified electronic urban development cadaster.
Ministry for Communities, Territories and Infrastructure Development of Ukraine The Unified Electronic Urban Development Cadaster has been put into operation with full functionality. In progress

Indicators of achievement of ESR

Total number of indicators – 1

Indicators fully achieved – 0

Partially achieved indicators – 0

Indicators with a score of 0% – 1

Summarized general information about Achievement Indicators

Indicators Weight (%)
1 The tools of the platform of the unified electronic urban development cadaster have ensured the mutual exchange and integration of data among the unified electronic urban development cadaster, the State Land Cadaster, the State Register of Real Rights to Immovable Property, the electronic register of cultural heritage sites, the State Forest Cadaster, the State Cadaster of Territories and Sites of the Nature Reserve Fund; geospatial data about the territory, administrative-territorial units; databases of ecological and forest cadasters, geotechnical conditions; data on facilities of the engineering and transport infrastructure, existing and proposed utility networks, line facilities of the energy infrastructure, distribution of capacities of utility networks, available unclaimed capacity, and technical specifications issued; geospatial data of technical inventory and registration of immovable properties, the unified register of addresses; 100%

Key sources of assessment:

Additional sources of information: