ESR
2.5.1.3. The Unified Electronic Urban Development Cadaster has been integrated with other registers, cadasters, and databases. Control over the currency and accuracy of data in the registers has been ensured, and responsibility for the timeliness and accuracy of the information entered into them has been established
Problem solving:
2.5.1. The lack of publicity surrounding the information in the field of urban development and land management fosters corruption and makes construction in violation of the law possible.
Deadlines for all measures within ESR
01.01.2024 -
31.03.2025
Implementation of SACP measures within ESR
Total number of measures –
2
Implementation of SACP measures within the scope of the Problem by main main performers
Summarized general information on Measures
Indicators of achievement of ESR
Total number of indicators – 1
Indicators fully achieved – 0
Partially achieved indicators – 0
Indicators with a score of 0% – 1
Summarized general information about Achievement Indicators
№ | Indicators | Weight (%) |
---|---|---|
1 | The tools of the platform of the unified electronic urban development cadaster have ensured the mutual exchange and integration of data among the unified electronic urban development cadaster, the State Land Cadaster, the State Register of Real Rights to Immovable Property, the electronic register of cultural heritage sites, the State Forest Cadaster, the State Cadaster of Territories and Sites of the Nature Reserve Fund; geospatial data about the territory, administrative-territorial units; databases of ecological and forest cadasters, geotechnical conditions; data on facilities of the engineering and transport infrastructure, existing and proposed utility networks, line facilities of the energy infrastructure, distribution of capacities of utility networks, available unclaimed capacity, and technical specifications issued; geospatial data of technical inventory and registration of immovable properties, the unified register of addresses; | 100% |