Direction 1.1.
Shaping and implementing the state anticorruption policy
50%
19 /
38
0.0%
Problem 1.1.1.
The state anticorruption policy is not always based on complete, objective, and reliable data; The efforts of different government agencies, local self-government bodies, and the public are not sufficiently coordinated
50%
19 /
38
0.0%
5.1
ОСР
1.1.1.5.
Sufficient funding and other essential resources are allocated for the needs of shaping and implementing the anticorruption policy
1.1.1.5.1 Annually formulating the performance indicators of Budget Program 6331030 “Implementation of Anticorruption Strategies” aimed at implementing the Program activities
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
50%
19 /
38
0.0%
5.2
1.1.1.5.2 Determining the tentative scope of budget allocations required for the relevant planning year for the implementation of activities of Budget Program 6331030 “Implementation of Anticorruption Strategies”
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
5.3
1.1.1.5.3 Approving sufficient financial resources within the State Budget of Ukraine for proper implementation of the activities outlined in Budget Program 6331030 “Implementation of Anticorruption Strategies”
Ministry of Finance of Ukraine
There is no progress in the implementation of the measure
In progress
5.4 (17)
1.1.1.5.4 (17) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Antimonopoly Committee of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (20)
1.1.1.5.4 (20)
State Agency of Ukraine for the Development of Melioration, Fisheries and Food Programs
Not started
5.4 (23)
1.1.1.5.4 (23) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Commission on Securities and Stock Market
The measure was implemented on time and in full
Implemented
5.4 (22)
1.1.1.5.4 (22) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Agency for Restoration and Infrastructure Development of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4 (21)
1.1.1.5.4 (21) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Regulatory Service of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (19)
1.1.1.5.4 (19) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Administration of State Service of Special Commucations and Information Protection of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4 (18)
1.1.1.5.4 (18) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Statistics Service of Ukraine
Implementation of the measure has not started
Not started
5.4 (16)
1.1.1.5.4 (16) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Property Fund of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (15)
1.1.1.5.4 (15) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Security Service of Ukraine
Implementation of the measure has not started
Not started
5.4 (14)
1.1.1.5.4 (14) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Asset Recovery and Management Agency
The measure was implemented on time and in full
Implemented
5.4 (13)
1.1.1.5.4 (13) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Economic Security Bureau of Ukraine
There is no progress in the implementation of the measure
In progress
5.4 (11)
1.1.1.5.4 (11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Police of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4 (1)
1.1.1.5.4 (1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
5.4 (12)
1.1.1.5.4 (12) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Anti-Corruption Bureau of Ukraine
There is no progress in the implementation of the measure
In progress
5.4 (2)
1.1.1.5.4 (2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Finance of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (3)
1.1.1.5.4 (3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry for Communities and Territories Development of Ukraine
There is no progress in the implementation of the measure
In progress
5.4 (4)
1.1.1.5.4 (4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Justice of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (5)
1.1.1.5.4 (5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Economy of Ukraine
There is no progress in the implementation of the measure
In progress
5.4 (6)
1.1.1.5.4 (6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Agrarian Policy and Food of Ukraine
There is progress in the implementation of the measure
In progress
5.4 (7)
1.1.1.5.4 (7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Social Policy of Ukraine
The measure was not implemented on time and in full
Implemented
5.4 (8)
1.1.1.5.4 (8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Education and Science of Ukraine
The measure was implemented on time and in full
Implemented
5.4 (9)
1.1.1.5.4 (9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Prosecutor General’s Office of Ukraine
The measure was implemented late and partially
Partially implemented
5.4 (10)
1.1.1.5.4 (10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Bureau of Investigation
There is no progress in the implementation of the measure
In progress
5.5 (12)
1.1.1.5.5 (12)
Fund for Social Protection of Persons with Disabilities
Not started
5.5 (11)
1.1.1.5.5 (11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Enterprise "Medical Procurement of Ukraine"
There is no progress in the implementation of the measure
In progress
5.5 (10)
1.1.1.5.5 (10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
National Health Service of Ukraine
Implementation of the measure has not started
Not started
5.5 (9)
1.1.1.5.5 (9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Regulatory Service of Ukraine
There is no progress in the implementation of the measure
In progress
5.5 (8)
1.1.1.5.5 (8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Service of Ukraine for Geodesy, Cartography and Cadastre
There is progress in the implementation of the measure
In progress
5.5 (7)
1.1.1.5.5 (7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Agency of Ukraine for the Development of Melioration, Fisheries and Food Programs
The measure was implemented late and partially
Partially implemented
5.5 (6)
1.1.1.5.5 (6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Service of Geology and Mineral Resources of Ukraine
Not started
5.5 (5)
1.1.1.5.5 (5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Forest Resources Agency of Ukraine
There is no progress in the implementation of the measure
In progress
5.5 (4)
1.1.1.5.5 (4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Health of Ukraine
The measure was not implemented on time and in full
Implemented
5.5 (3)
1.1.1.5.5 (3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Social Policy of Ukraine
The measure was not implemented on time and in full
Implemented
5.5 (2)
1.1.1.5.5 (2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Environmental Protection and Natural Resources of Ukraine
Implementation of the measure has not started
Not started
5.5 (1)
1.1.1.5.5 (1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Agrarian Policy and Food of Ukraine
There is progress in the implementation of the measure
In progress