SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

ESR: 2.5.1.1. The implementation of the Unified State Electronic System in Construction has been finalized

Progress in the implementation of measures as of 22.12.2024
measures, the implementation of which as of 30.09.2024
2 2
4
In progress Not started
Measures implemented (fully and partially) - 0 ( 0%)
Name of the ESR Name of the measure The main implementer Monitoring results (latest) Status % of measures implemented (fully and partially) Evaluation of achievement of ESR Середній рівень ОСР
Direction 2.5. Construction, land relations, and infrastructure
0% 0 / 4
0.0%
Problem 2.5.1. The lack of publicity surrounding the information in the field of urban development and land management fosters corruption and makes construction in violation of the law possible.
0% 0 / 4
0.0%
1.1 ОСР 2.5.1.1. The implementation of the Unified State Electronic System in Construction has been finalized 2.5.1.1.1 Implementing measures towards systematization and public access to the entirety of the urban development documentation currently in effect, integrating it into the Unified State Electronic System in Construction, particularly by: 1) populating the Unified State Electronic System in Construction with materials of urban development documentation (other than classified information); 2) granting viewer access to urban development documentation in any administrative-territorial unit or territorial community with the level of detail down to a separate land plot (other than classified information); 3) enabling employees of urban development and architecture authorities to enter urban development documentation of the relevant level into the Unified State Electronic System in Construction and update it; 4) enabling users of the Unified State Electronic System in Construction to use geospatial data sets of urban development documentation, orthophotomaps, topographic maps and plans of the relevant levels in the state geodesic coordinate system USK-2000, which have been published as geospatial data display services (other than classified information). Ministry for Communities and Territories Development of Ukraine Not started
0% 0 / 4
0.0%
1.2 2.5.1.1.2 Launch of the service for validation and public discussion (particularly electronic public discussions) of drafts of urban development documentation on the portal of the Unified State Electronic System in Construction Ministry for Communities and Territories Development of Ukraine Not started
1.3 2.5.1.1.3 Implementing measures towards integration and electronic data exchange among the Unified State Electronic System in Construction, the State Register of Real Rights to Immovable Property, and the State Land Cadaster, in particular by: 1) reflecting immovable properties in the State Land Cadaster and integrating information about immovable properties and construction projects in progress (issued construction manifests, registered urban development conditions and restrictions, current documents that authorize construction work), accessing the information of the Unified State Electronic System in Construction about construction projects in progress within the State Land Cadaster; 2) enabling state registrars of rights to immovable property to receive information from the Unified State Electronic System in Construction about the results of technical inventory of immovable properties. Ministry for Communities and Territories Development of Ukraine There is progress in the implementation of the measure In progress
1.4 2.5.1.1.4 Implementing measures towards integration and electronic data exchange between the Unified State Electronic System in Construction and the electronic register of cultural heritage sites not only based on the address but also based on geospatial data of properties and the registration number of the cultural heritage site Ministry for Communities and Territories Development of Ukraine There is progress in the implementation of the measure In progress