SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
ESR: 2.5.3.4. The discretionary powers of the architectural and construction control and oversight authorities have been eliminated by defining an exhaustive list of grounds for refusing to issue permits or for cancel permits, issuing improvement notices or imposing sanctions, and the authorities have been obligated to take action (make decisions) prescribed by law if the relevant grounds for doing so exist
Progress in the implementation of measures as of
25.02.2026
1 |
100%
1
Not implemented
Measures implemented (fully and partially) -
0 (0%)
№
Name of the ESR
Name of the measure
The main implementer
Monitoring results (latest)
Status
% of measures implemented (fully and partially)
Direction 2.5.
Construction, land relations, and infrastructure
0%
0 /
1
Problem 2.5.3.
The flawed system of state oversight and regulation in the construction sector fosters corrupt practices
0%
0 /
1
4.1
ОСР
2.5.3.4.
The discretionary powers of the architectural and construction control and oversight authorities have been eliminated by defining an exhaustive list of grounds for refusing to issue permits or for cancel permits, issuing improvement notices or imposing sanctions, and the authorities have been obligated to take action (make decisions) prescribed by law if the relevant grounds for doing so exist