SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS
Progress in the implementation of measures as of
23.11.2024
measures, the implementation of which as of
30.09.2024
1 |
8.3%
3 |
25%
3 |
25%
4 |
33.3%
1 |
8.3%
12
ImplementedPartially implementedIn progressNot implementedNot started
Measures implemented (fully and partially) -
4 (
33.3%)
№
Name of the ESR
Name of the measure
The main implementer
Monitoring results (latest)
Status
% of measures implemented (fully and partially)
Evaluation of achievement of ESR
Середній рівень ОСР
Direction 1.1.
Shaping and implementing the state anticorruption policy
100%
1 /
1
0.0%
Problem 1.1.1.
The state anticorruption policy is not always based on complete, objective, and reliable data; The efforts of different government agencies, local self-government bodies, and the public are not sufficiently coordinated
100%
1 /
1
0.0%
5.4 (27)
ОСР
1.1.1.5.
Sufficient funding and other essential resources are allocated for the needs of shaping and implementing the anticorruption policy
State Agency for Restoration and Infrastructure Development of Ukraine
The measure was implemented on time, but partially
Partially implemented
100%
1 /
1
0.0%
Direction 2.5.
Construction, land relations, and infrastructure
27.3%
3 /
11
0.0%
Problem 2.5.10.
Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
27.3%
3 /
11
0.0%
1.1 (1)
ОСР
2.5.10.1.
With regard to public infrastructure projects, the mandatory publication of all information required by the Law of Ukraine On the Openness of Spending of Public Funds and data disclosure in accordance with
CoST IDS (Infrastructure Data Standard) and publication of data (including design documentation and methodology for calculating the anticipated cost of procurement) in a machine-readable format in accordance with OC4IDS and OCDS standards
State Agency for Restoration and Infrastructure Development of Ukraine
There is progress in the implementation of the measure
In progress
3.5
ОСР
2.5.10.3.
An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction
State Agency for Restoration and Infrastructure Development of Ukraine
Not started
0%
0 /
1
0.0%
4.2
ОСР
2.5.10.4.
Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys
State Agency for Restoration and Infrastructure Development of Ukraine
There is progress in the implementation of the measure
In progress
5.1
ОСР
2.5.10.5.
Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety