2.5.3.6. Easy and quick access to utility and transportation infrastructure has been ensured

Problem solving:

2.5.3. The flawed system of state oversight and regulation in the construction sector fosters corrupt practices

Deadlines for all measures within ESR

01.03.2023 - 31.08.2023

Implementation of SACP measures within ESR

Total number of measures – 2
1 1
Not implemented Not started

Implementation of SACP measures within the scope of the Problem by main main performers

Ministry for Communities and Territories Development of Ukraine

0%
2

Summarized general information on Measures

Name of the measure The main implementer Co-implementors Performance indicator Monitoring results (latest) Статус
1 2.5.3.6.1 Supporting the consideration of the Draft Law of Ukraine On Amendments to Select Legislative Acts of Ukraine Pertaining to the Resolution of Specific Issues of Connection to Utility Networks (registration number 5183 dated March 2, 2021) in the Parliament of Ukraine (particularly if the President of Ukraine vetoes the draft law) Ministry for Communities and Territories Development of Ukraine The law has been signed by the President of Ukraine.
Implementation of the measure has not started
Not started
2 2.5.3.6.2 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
1) introduces the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies;
2) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community);
3) defines the procedure for inventorying existing utility networks, according to which the requirements for planning (urban development) documentation can be refined in greater detail simultaneously with the inventory process;
4) establishes that information about utility networks must be reflected in the State Land Cadaster, on the National Geoportal, in the Unified State Electronic System in Construction, the unified electronic urban development cadaster, geospatial information systems of enterprises (other than classified information);
5) provides for the alignment of development plans of specific industries with spatial plans (urban development documentation) by developing industry-specific plans;
6) abolishes “technical specifications” as input data for design, in order to create a favorable environment for investing activities, with the information about available capacity (and prospects of its expansion) and the distance and route to points where capacity is available to be obtained automatically from the unified electronic urban development cadaster, with the simultaneous reflection of this information in the unified electronic urban development cadaster, the Unified State Electronic System in Construction, geospatial information systems of enterprises, and on the National Geoportal;
7) provides for the preparation of engineering documentation on land management with respect to the establishment of buffer zones and reflecting the buffer zones in the State Land Cadaster and the unified electronic urban development cadaster, making adjustments to the zones in accordance with land management documentation depending on the terrain features, the technology used to install the utility networks, etc. (if the draft law indicated in subclause 2.5.3.6.1 is not passed).
Ministry for Communities and Territories Development of Ukraine The draft law has been submitted to the Parliament of Ukraine.
The measure has not been implemented
Not implemented

Indicators of achievement of ESR

Total number of indicators – 1

Indicators fully achieved – 0

Partially achieved indicators – 0

Indicators with a score of 0% – 1

Summarized general information about Achievement Indicators

Indicators Weight (%)
1 A law has taken effect, which has amended select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
a) introduces the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies (15 percent);
b) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community) (20 percent);
c) defines the procedure for inventorying existing utility networks, according to which the requirements for planning (urban development) documentation can be refined in greater detail simultaneously with the inventory process (10 percent);
d) establishes that information about utility networks must be reflected in the State Land Cadaster, on the National Geoportal, in the Unified State Electronic System in Construction, the unified electronic urban development cadaster, geospatial information systems of enterprises (other than classified information) (15 percent);
e) provides for the alignment of development plans of specific industries with spatial plans (urban development documentation) by developing industry-specific plans (10 percent);
f) abolishes “technical specifications” as input data for design, in order to create a favorable environment for investing activities, with the information about available capacity (and prospects of its expansion) and the distance and route to points where capacity is available to be obtained automatically from the unified electronic urban development cadaster, with the simultaneous reflection of this information in the unified electronic urban development cadaster, the Unified State Electronic System in Construction, geospatial information systems of enterprises, and on the National Geoportal (20 percent);
g) provides for the preparation of engineering documentation on land management with respect to the establishment of buffer zones and reflecting the buffer zones in the State Land Cadaster and the unified electronic urban development cadaster, making adjustments to the zones in accordance with land management documentation depending on the terrain features, the technology used to install the utility networks, etc. (10 percent).
100%