Feedback from the public

ESR

2.5.3.6. Easy and quick access to utility and transportation infrastructure has been ensured

Problem solving:

2.5.3. The flawed system of state oversight and regulation in the construction sector fosters corrupt practices

Deadlines for all measures within ESR

01.03.2023 - 31.12.2025

Implementation of SACP measures within ESR

Total number of measures – 2
1 1
In progress Not started

Implementation of SACP measures within the scope of the Problem by main main performers

Ministry for Communities and Territories Development of Ukraine

0%
2

Summarized general information on Measures

Name of the measure The main implementer Co-implementors Performance indicator Monitoring results (latest) Статус
1 2.5.3.6.1 Supporting the consideration of the Draft Law of Ukraine On Amendments to Select Legislative Acts of Ukraine Pertaining to the Resolution of Specific Issues of Connection to Utility Networks (registration number 5183 dated March 2, 2021) in the Parliament of Ukraine (particularly if the President of Ukraine vetoes the draft law) Ministry for Communities and Territories Development of Ukraine The law has been signed by the President of Ukraine.
Implementation of the measure has not started
Not started
2 2.5.3.6.2 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
1) implemented the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies;
2) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community);
3) identified the procedure for inventory of engineering networks, which simultaneously performs uploading of Urban planning cadaster on the state’s level for further development and update of urban planning documentation;
4) implemented indication of data on engineering networks in Urban planning cadaster on the state’s level, enterprises’ geographic information systems (besides restricted information).
Ministry for Communities and Territories Development of Ukraine The draft law has been submitted to the Parliament of Ukraine.
Implementation of the measure was started late
In progress

Indicators of achievement of ESR

Total number of indicators – 1

Indicators fully achieved – 0

Partially achieved indicators – 0

Indicators with a score of 0% – 1

Summarized general information about Achievement Indicators

Indicators Weight (%)
1 A law has taken effect, which has amended select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
a) introduces the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies (25 percent);
b) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community) (25 percent)
c) identified the procedure for inventory of engineering networks, which simultaneously performs uploading of Urban planning cadaster on the state’s level for further development and update of urban planning documentation (25 percent);
d) implemented indication of data on engineering networks in Urban planning cadaster on the state’s level, enterprises’ geographic information systems (besides restricted information) (25 percent)
100%

Key sources of assessment:

Additional sources of information: