2.5.10.4. Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys
Problem solving:
2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
Deadlines for all measures within ESR
01.03.2023 -
31.12.2025
Implementation of SACP measures within ESR
Total number of measures –
6
1
1
4
Implemented
In progress
Not implemented
Implementation of SACP measures within the scope of the Problem by main main performers
State Agency for Restoration and Infrastructure Development of Ukraine
0%
5
State Enterprise “Ukrainian Research and Training Center for Problems of Standardization, Certification and Quality”
100%
1
Summarized general information on Measures
№ | Name of the measure | The main implementer | Co-implementors | Performance indicator | Monitoring results (latest) | Статус |
---|---|---|---|---|---|---|
1 | 2.5.10.4.1 Drafting and issuing the order of the Ministry of Infrastructure on approval of State Standard of Ukraine DSTU ХХХХ:20ХХ “Motor Roads. Rules for Scheduling Repairs”, which sets forth the requirements applicable to the planning of all road construction operations, taking into account the results of instrument-assisted surveys | State Enterprise “Ukrainian Research and Training Center for Problems of Standardization, Certification and Quality” | Державне агентство відновлення та розвитку інфраструктури України, Міністерство розвитку громад та територій України | The order has been issued. |
The measure was implemented on time and in full
|
|
2 | 2.5.10.4.2 Drafting an order of the Ministry of Infrastructure on approval of the algorithm (procedure, methodology) of instrument-assisted surveys of the condition of motor roads and selection of road segments for repairs (sequence) | State Agency for Restoration and Infrastructure Development of Ukraine | Міністерство розвитку громад та територій України | The draft order has been developed. |
The measure has not been implemented
|
|
3 | 2.5.10.4.3 Holding a public discussion of the draft order indicated in subclause 2.5.10.4.2, and ensuring its revision (if needed) | State Agency for Restoration and Infrastructure Development of Ukraine | Міністерство розвитку громад та територій України | The public discussion has been conducted and its results have been made public. |
The measure has not been implemented
|
|
4 | 2.5.10.4.4 Issuing the order indicated in subclause 2.5.10.4.2 | State Agency for Restoration and Infrastructure Development of Ukraine | Міністерство розвитку громад та територій України | The order has been issued. |
The measure has not been implemented
|
|
5 | 2.5.10.4.5 Developing and implementing a data storage system with the functionality for automatic selection (prioritization) of motor roads for the purposes of planning road repairs based on data of instrument-assisted surveys | State Agency for Restoration and Infrastructure Development of Ukraine | Міністерство розвитку громад та територій України | The system has been developed and put into commercial operation. |
The measure has not been implemented
|
|
6 | 2.5.10.4.6 Gathering data based on the results of instrument-assisted surveys of motor roads, which are used to plan road construction work with the help of the system indicated in subclause 2.5.10.4.5 | State Agency for Restoration and Infrastructure Development of Ukraine | Міністерство розвитку громад та територій України | Data of instrument-assisted surveys of motor roads is being gathered and entered into the system. |
There is progress in the implementation of the measure
|
Indicators of achievement of ESR
Total number of indicators – 4
Indicators fully achieved – 0
Partially achieved indicators – 0
Indicators with a score of 0% – 4
Summarized general information about Achievement Indicators
№ | Indicators | Weight (%) |
---|---|---|
1 | The order of the National Standardization Authority has taken effect, which has adopted the national standard DSTU XXXX:20XX Motor Roads. Rules for Scheduling Repairs (which stipulates that all road construction works must be planned taking into account the results of instrument-assisted surveys). | 30% |
2 | The order of the Ministry of Infrastructure has taken effect, which approves the algorithm of instrument-assisted surveys of the condition of motor roads and the procedure for selecting priority road segments for repairs (sequence). | 30% |
3 | A data storage system has been implemented with the functionality for automatic selection (prioritization) of motor roads for the purposes of planning road repairs based on data of instrument-assisted surveys. | 20% |
4 | Planning of road construction works is carried out transparently, in accordance with the approved requirements, using an appropriate system, taking into account the results of instrument-assisted surveys. | 20% |