Feedback from the public

ESR

2.5.10.4. Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys

Problem solving:

2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes

Deadlines for all measures within ESR

01.03.2023 - 31.12.2025

Implementation of SACP measures within ESR

Total number of measures – 6
1 1 4
Implemented In progress Not implemented

Implementation of SACP measures within the scope of the Problem by main main performers

State Agency for Restoration and Infrastructure Development of Ukraine

0%
5

State Enterprise “Ukrainian Research and Training Center for Problems of Standardization, Certification and Quality”

100%
1

Summarized general information on Measures

Name of the measure The main implementer Co-implementors Performance indicator Monitoring results (latest) Статус
1 2.5.10.4.1 Drafting and issuing the order of the Ministry of Infrastructure on approval of State Standard of Ukraine DSTU ХХХХ:20ХХ “Motor Roads. Rules for Scheduling Repairs”, which sets forth the requirements applicable to the planning of all road construction operations, taking into account the results of instrument-assisted surveys State Enterprise “Ukrainian Research and Training Center for Problems of Standardization, Certification and Quality” Державне агентство відновлення та розвитку інфраструктури України, Міністерство розвитку громад та територій України The order has been issued.
The measure was implemented on time and in full
Implemented
2 2.5.10.4.2 Drafting an order of the Ministry of Infrastructure on approval of the algorithm (procedure, methodology) of instrument-assisted surveys of the condition of motor roads and selection of road segments for repairs (sequence) State Agency for Restoration and Infrastructure Development of Ukraine Міністерство розвитку громад та територій України The draft order has been developed.
The measure has not been implemented
Not implemented
3 2.5.10.4.3 Holding a public discussion of the draft order indicated in subclause 2.5.10.4.2, and ensuring its revision (if needed) State Agency for Restoration and Infrastructure Development of Ukraine Міністерство розвитку громад та територій України The public discussion has been conducted and its results have been made public.
The measure has not been implemented
Not implemented
4 2.5.10.4.4 Issuing the order indicated in subclause 2.5.10.4.2 State Agency for Restoration and Infrastructure Development of Ukraine Міністерство розвитку громад та територій України The order has been issued.
The measure has not been implemented
Not implemented
5 2.5.10.4.5 Developing and implementing a data storage system with the functionality for automatic selection (prioritization) of motor roads for the purposes of planning road repairs based on data of instrument-assisted surveys State Agency for Restoration and Infrastructure Development of Ukraine Міністерство розвитку громад та територій України The system has been developed and put into commercial operation.
The measure has not been implemented
Not implemented
6 2.5.10.4.6 Gathering data based on the results of instrument-assisted surveys of motor roads, which are used to plan road construction work with the help of the system indicated in subclause 2.5.10.4.5 State Agency for Restoration and Infrastructure Development of Ukraine Міністерство розвитку громад та територій України Data of instrument-assisted surveys of motor roads is being gathered and entered into the system.
There is progress in the implementation of the measure
In progress

Indicators of achievement of ESR

Total number of indicators – 4

Indicators fully achieved – 0

Partially achieved indicators – 0

Indicators with a score of 0% – 4

Summarized general information about Achievement Indicators

Indicators Weight (%)
1 The order of the National Standardization Authority has taken effect, which has adopted the national standard DSTU XXXX:20XX Motor Roads. Rules for Scheduling Repairs (which stipulates that all road construction works must be planned taking into account the results of instrument-assisted surveys). 30%
2 The order of the Ministry of Infrastructure has taken effect, which approves the algorithm of instrument-assisted surveys of the condition of motor roads and the procedure for selecting priority road segments for repairs (sequence). 30%
3 A data storage system has been implemented with the functionality for automatic selection (prioritization) of motor roads for the purposes of planning road repairs based on data of instrument-assisted surveys. 20%
4 Planning of road construction works is carried out transparently, in accordance with the approved requirements, using an appropriate system, taking into account the results of instrument-assisted surveys. 20%