SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

ESR: 2.5.3.6. Easy and quick access to utility and transportation infrastructure has been ensured

Progress in the implementation of measures as of 25.02.2026
1
1
Partially implemented
Measures implemented (fully and partially) - 1 (100%)
Selected filters:
Заходи, які підлягають виконанню
Clean the filter
Name of the ESR Name of the measure The main implementer Monitoring results (latest) Status % of measures implemented (fully and partially)
Direction 2.5. Construction, land relations, and infrastructure
100% 1 / 1
Problem 2.5.3. The flawed system of state oversight and regulation in the construction sector fosters corrupt practices
100% 1 / 1
6.2 ОСР 2.5.3.6. Easy and quick access to utility and transportation infrastructure has been ensured 2.5.3.6.2 Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which: 1) implemented the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies; 2) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community); 3) identified the procedure for inventory of engineering networks, which simultaneously performs uploading of Urban planning cadaster on the state’s level for further development and update of urban planning documentation; 4) implemented indication of data on engineering networks in Urban planning cadaster on the state’s level, enterprises’ geographic information systems (besides restricted information). Ministry for Communities and Territories Development of Ukraine The measure was implemented on time, but partially Partially implemented
100% 1 / 1