Measure
2.5.10.4.3. Holding a public discussion of the draft order indicated in subclause 2.5.10.4.2, and ensuring its revision (if needed)
Measure status:
The measure is aimed at achieving ESR:
2.5.10.4. Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys
Problem solving:
2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes
Deadlines:
Responsible implementors (authorities):
Ministry for Communities and Territories Development of Ukraine
Sources of funding:
state budget
Volumes of financing (thousand UAH):
within the established budget allocations for the relevant year
Performance indicator:
The public discussion has been conducted and its results have been made public.
In accordance with the Resolution of the Cabinet of Ministers of Ukraine No. 1194 On Amendments to the State Anti-Corruption Programme for 2023-2025 dated 18 October 2024, the content of the measure was amended.