1.1.
ESR 1.1.1.1 Studies aimed at ascertaining the overall indicators and causes of corruption in Ukraine, as well as measurements of experiences and perception of corruption by the population are undertaken regularly
1.1.1.1.1. Organizing an annual (in the second half of each year) standardized survey on corruption in Ukraine according to the methodology approved by the National Agency on Corruption Prevention
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
100%
3/
3
1.2.
1.1.1.1.2. Organizing an expert survey on the assessment of the level of corruption in Ukraine according to the methodology approved by the National Agency, in 2023 and 2025
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
1.3.
1.1.1.1.3. Updating the Methodology of the Standardized Survey on Corruption in Ukraine, approved by an order of the National Agency, taking into account changes in the socio-political situation and the results of recent studies on corrupt practices in the areas covered by the standardized survey
National Agency on Corruption Prevention
The measure was not implemented on time and in full
Implemented
2.1.
ESR 1.1.1.2 A single unified system for gathering, consolidating, and visualizing statistical data prescribed by Part 2 of Article 183 of the Law of Ukraine On Prevention of Corruption (hereinafter “the Law”) on the performance of the National Agency, the National Anticorruption Bureau of Ukraine, the State Bureau of Investigations, ARMA, the National Police of Ukraine, the prosecutorial authorities, courts and other government agencies has been implemented
1.1.1.2.1. Defining the procedure by which the National Anticorruption Bureau, the State Bureau of Investigations, the Asset Recovery and Management Agency, the National Police, prosecutorial authorities, courts, and other government agencies shall furnish information prescribed by Article 183 of the Law to the National Agency
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
100%
10/
10
2.2.(7)
1.1.1.2.2.(7) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
Economic Security Bureau of Ukraine
Implementation of the measure has started on time
In progress
2.2.(8)
1.1.1.2.2.(8) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
Security Service of Ukraine
Implementation of the measure has started on time
In progress
2.2.(6)
1.1.1.2.2.(6) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
State Judicial Administration of Ukraine
Implementation of the measure has started on time
In progress
2.2.(5)
1.1.1.2.2.(5) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
Prosecutor General’s Office of Ukraine
Implementation of the measure has started on time
In progress
2.2.(4)
1.1.1.2.2.(4) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
National Police of Ukraine
Implementation of the measure has started on time
In progress
2.2.(3)
1.1.1.2.2.(3) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
Asset Recovery and Management Agency
Implementation of the measure has started on time
In progress
2.2.(2)
1.1.1.2.2.(2) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
State Bureau of Investigation
Implementation of the measure has started on time
In progress
2.2.(1)
1.1.1.2.2.(1) Annual submission (by February 15) by specially authorized anticorruption entities and actors implementing the 2023-2025 State Anticorruption Program (hereinafter “the Program”) of statistical data on the results of their work to the National Agency, with mandatory inclusion of data specified in Part 2 of Article 183 of the Law
National Anti-Corruption Bureau of Ukraine
Implementation of the measure has started on time
In progress
2.3.
1.1.1.2.3. Gathering, consolidating, and visualizing (by April 15) statistical data submitted by specially authorized anticorruption entities and other government agencies pursuant to Article 183 of the Law, on the official website of the National Agency (following the creation of the information system for monitoring the implementation of the state anticorruption policy (hereinafter “the information monitoring system”) — within a dedicated segment of this system)
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
3.1.
ESR 1.1.1.3 While shaping and implementing the state policy, the National Agency, the Cabinet of Ministers of Ukraine, the Parliament of Ukraine, and other government agencies use official statistical data, the results of assessment of corruption risks, and summaries of the most widespread corrupt practices, and also consider the results of opinion polls and other studies
1.1.1.3.1. Creating a dedicated page on the official website of the National Agency to reflect key statistics on the progress made in combating corruption or corruption-related crimes
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
400%
32/
8
3.2.
1.1.1.3.2. Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to the Law, under which the National Agency would be tasked with launching and maintaining on an ongoing basis the Unified Nationwide Register “Status of the Fight Against Corruption-Related Administrative Offenses” as part of the information monitoring system
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
3.3.
1.1.1.3.3. Drafting and approving the Procedure by which the National Agency shall maintain the Unified Nationwide Register “Status of the Fight Against Corruption-Related Administrative Offenses”, as well as the forms to be used by agencies of the National Police, prosecutorial authorities, and the State Judicial Administration (SJA) to submit the relevant information
National Agency on Corruption Prevention
Not started
3.4.
1.1.1.3.4. Granting unrestricted round-the-clock access to the Unified Nationwide Register “Status of the Fight Against Corruption-Related Administrative Offenses” through the information monitoring system
National Agency on Corruption Prevention
Not started
3.5.
1.1.1.3.5. Creating a dedicated page—“Library of Major Opinion Polls”—on the official website of the National Agency, to publish opinion polls conducted in Ukraine over the past decade, which shed light on specific issues of perception, prevalence, and causes of corruption, as well as the effectiveness of efforts to prevent and combat corruption
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
3.6.
1.1.1.3.6. Creating a dedicated page—“Library of Fundamental Analytical Studies”—on the official website of the National Agency, to publish the most comprehensive and fundamental studies (monographs, theses, textbooks, collected works, etc.) of recent years dealing with the issues of preventing and combating corruption
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
3.7.
1.1.1.3.7. Creating a dedicated page—“Academic Periodicals”—on the official website of the National Agency, to publish academic articles of recent years devoted to the issues of preventing and combating corruption
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
3.8.
1.1.1.3.8. Submitting key information relating to the issues of preventing and combating corruption once every six months to the Cabinet of Ministers of Ukraine, the Parliament of Ukraine, the President of Ukraine, the Ukrainian Parliament committee overseeing the issues of combating corruption, the National Council on the Anticorruption Policy, as well as other government agencies, in order to enable these authorities to consider this information while formulating the anticorruption and sectoral policies
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
4.1.
ESR 1.1.1.4 Information on the progress made in implementing the anticorruption policy is gathered, analyzed, and made public with the use of modern IT tools
1.1.1.4.1. Creating and launching the information monitoring system
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
200%
6/
3
4.2.
1.1.1.4.2. Drafting and approving the Regulation on the information system for monitoring the implementation of the state anticorruption policy, which specifically obligates all Program implementing actors to submit a quarterly report (no later than 15 days after the end of the reporting quarter) to the National Agency with information on the progress of implementation of the Program activities by entering this information into the classified section of the information monitoring system
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
4.3.
1.1.1.4.3. Ensuring the population of the information monitoring system with information indicated in Part 1 of Article 184 of the Law
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
5.1.
ESR 1.1.1.5 Sufficient funding and other essential resources are allocated for the needs of shaping and implementing the anticorruption policy
1.1.1.5.1. Annually formulating the performance indicators of Budget Program 6331030 “Implementation of Anticorruption Strategies” aimed at implementing the Program activities
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
1400%
532/
38
5.2.
1.1.1.5.2. Determining the tentative scope of budget allocations required for the relevant planning year for the implementation of activities of Budget Program 6331030 “Implementation of Anticorruption Strategies”
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
5.3.
1.1.1.5.3. Approving sufficient financial resources within the State Budget of Ukraine for proper implementation of the activities outlined in Budget Program 6331030 “Implementation of Anticorruption Strategies”
Ministry of Finance of Ukraine
There is no progress in the implementation of the measure
In progress
5.4.(13)
1.1.1.5.4.(13) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Economic Security Bureau of Ukraine
There is no progress in the implementation of the measure
In progress
5.4.(14)
1.1.1.5.4.(14) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Asset Recovery and Management Agency
The measure was implemented on time and in full
Implemented
5.4.(15)
1.1.1.5.4.(15) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Security Service of Ukraine
Implementation of the measure has not started
Not started
5.4.(16)
1.1.1.5.4.(16) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Property Fund of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(17)
1.1.1.5.4.(17) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Antimonopoly Committee of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(18)
1.1.1.5.4.(18) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Statistics Service of Ukraine
Implementation of the measure has not started
Not started
5.4.(19)
1.1.1.5.4.(19) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Administration of State Service of Special Commucations and Information Protection of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4.(21)
1.1.1.5.4.(21) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Regulatory Service of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(22)
1.1.1.5.4.(22) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Agency for Restoration and Infrastructure Development of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4.(23)
1.1.1.5.4.(23) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Commission on Securities and Stock Market
The measure was implemented on time and in full
Implemented
5.4.(20)
1.1.1.5.4.(20)
State Agency of Ukraine for the Development of Melioration, Fisheries and Food Programs
Not started
5.4.(11)
1.1.1.5.4.(11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Police of Ukraine
The measure was implemented on time, but partially
Partially implemented
5.4.(12)
1.1.1.5.4.(12) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Anti-Corruption Bureau of Ukraine
There is no progress in the implementation of the measure
In progress
5.4.(1)
1.1.1.5.4.(1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
5.4.(2)
1.1.1.5.4.(2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Finance of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(3)
1.1.1.5.4.(3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry for Communities and Territories Development of Ukraine
There is no progress in the implementation of the measure
In progress
5.4.(4)
1.1.1.5.4.(4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Justice of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(5)
1.1.1.5.4.(5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Economy of Ukraine
There is no progress in the implementation of the measure
In progress
5.4.(7)
1.1.1.5.4.(7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Social Policy of Ukraine
The measure was not implemented on time and in full
Implemented
5.4.(8)
1.1.1.5.4.(8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Education and Science of Ukraine
The measure was implemented on time and in full
Implemented
5.4.(9)
1.1.1.5.4.(9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Prosecutor General’s Office of Ukraine
The measure was implemented late and partially
Partially implemented
5.4.(10)
1.1.1.5.4.(10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
State Bureau of Investigation
There is no progress in the implementation of the measure
In progress
5.4.(6)
1.1.1.5.4.(6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities planned for 2024 and 2025 and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.2.2.2, 1.4.2.2.4, 1.5.3.1.6, 2.2.3.1.1, 2.2.3.1.2, 2.2.3.1.3, 2.2.3.1.4, 2.2.3.3.3, 2.2.3.3.4, 2.2.3.3.5, 2.4.2.3.5, 2.4.3.1.7––2.4.3.1.10, 2.5.1.1.1, 2.5.1.1.2, 2.5.1.2.2—2.5.1.4.2, 2.5.4.3.2––2.5.4.3.5, 2.5.10.2.5, 2.5.10.2.6, 2.5.10.3.2, 2.5.10.3.3, 2.5.10.3.5, 2.6.4.1.2, 2.7.3.4.9, 2.7.5.2.2, 2.7.7.1.4, 3.3.2.3.4, 3.3.3.8.3)
Ministry of Agrarian Policy and Food of Ukraine
There is progress in the implementation of the measure
In progress
5.5.(7)
1.1.1.5.5.(7) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Agency of Ukraine for the Development of Melioration, Fisheries and Food Programs
The measure was implemented late and partially
Partially implemented
5.5.(12)
1.1.1.5.5.(12)
Fund for Social Protection of Persons with Disabilities
Not started
5.5.(11)
1.1.1.5.5.(11) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Enterprise "Medical Procurement of Ukraine"
There is no progress in the implementation of the measure
In progress
5.5.(10)
1.1.1.5.5.(10) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
National Health Service of Ukraine
Implementation of the measure has not started
Not started
5.5.(9)
1.1.1.5.5.(9) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Regulatory Service of Ukraine
There is no progress in the implementation of the measure
In progress
5.5.(8)
1.1.1.5.5.(8) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Service of Ukraine for Geodesy, Cartography and Cadastre
There is progress in the implementation of the measure
In progress
5.5.(6)
1.1.1.5.5.(6) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Service of Geology and Mineral Resources of Ukraine
Not started
5.5.(5)
1.1.1.5.5.(5) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
State Forest Resources Agency of Ukraine
There is no progress in the implementation of the measure
In progress
5.5.(4)
1.1.1.5.5.(4) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Health of Ukraine
The measure was not implemented on time and in full
Implemented
5.5.(3)
1.1.1.5.5.(3) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Social Policy of Ukraine
The measure was not implemented on time and in full
Implemented
5.5.(2)
1.1.1.5.5.(2) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Environmental Protection and Natural Resources of Ukraine
Implementation of the measure has not started
Not started
5.5.(1)
1.1.1.5.5.(1) Performing financial and economic calculations of needs (specifically by developing a feasibility study of the creation or modernization of IT systems) required for implementation of the activities throughout 2024 and 2025 necessitated by the passage of normative legal acts, and the needs that require additional funding (specifically activities aimed at creating or modernizing IT systems and/or electronic communication networks, information technology development tools, and information resources), particularly during the formulation of budget proposals for 2024 and 2025 (financial and economic calculations must be performed and feasibility studies developed for the following activities: 1.4.3.2.2––1.4.3.2.4, 2.2.1.1.5––2.2.1.1.7, 2.2.2.1.3, 2.2.2.1.4, 2.2.2.2.6, 2.5.5.1.3––2.5.5.1.6, 2.6.1.3.4––2.6.1.3.7, 2.7.1.1.3, 2.7.1.2.3, 2.7.1.1.4, 2.7.1.2.4, 2.7.3.2.6, 2.7.3.2.7, 2.7.3.3.5, 2.7.3.3.6, 3.3.3.9.1)
Ministry of Agrarian Policy and Food of Ukraine
There is progress in the implementation of the measure
In progress
6.1.
ESR 1.1.1.6 The coordination of implementation of the anticorruption policy is efficient and effective, particularly owing to the creation of effective mechanisms of cooperation between the anticorruption institutions and other government agencies and local self-government bodies
1.1.1.6.1. Drafting and approving the Procedure for Coordinating the Implementation of Anti-Сorruption Strategy for 2021-2025, approved by the Law of Ukraine dated June 20, 2022, No. 2322-IX On the Fundamentals of the State Anti-Corruption Policy for 2021-2025 (hereinafter “the Anticorruption Strategy”) and the Program
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
500%
35/
7
6.4.
1.1.1.6.4. Drafting and approving (by an order of the National Agency) the Regulation on the Coordinating Working Group on the Issues of the Anticorruption Policy (as a consultative and advisory body of the National Agency), which defines the key objectives of this body as follows:
1) facilitating the coordination of the efforts of government agencies towards the implementation of the Anticorruption Strategy and implementation of Program activities;
2) preparing proposals regarding the formulation and implementation of the state anticorruption policy (particularly in matters of improving the regulatory and legislative framework).
National Agency on Corruption Prevention
The measure was not implemented on time and in full
Implemented
6.5.
1.1.1.6.5. Formulating proposals regarding the individual members of the Coordinating Working Group on the Issues of the Anticorruption Policy and submitting them to the Cabinet of Ministers of Ukraine
National Agency on Corruption Prevention
The measure was not implemented on time and in full
Implemented
6.6.
1.1.1.6.6. Approving the individual members of the Coordinating Working Group on the Issues of the Anticorruption Policy, which is co-chaired by the Chairman of the National Agency and the a minister of the Cabinet of Ministers of Ukraine
National Agency on Corruption Prevention
The measure was not implemented on time and in full
Implemented
6.7.
1.1.1.6.7. Implementation of measures by the National Agency towards encouraging the Program implementing actors to implement the Program activities in a timely manner and effectively. In particular, at least once every quarter the National Agency shall send official letters to those Program actors that have failed to implement or have inadequately implemented the activities in respect of which they have been designated as implementing actors.
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
6.8.
1.1.1.6.8. Ensuring the quarterly update of the Cabinet of Ministers of Ukraine, the Parliament of Ukraine (particularly the Ukrainian Parliament committee overseeing the issues of combating corruption), and the President of Ukraine on the status of Program implementation
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
6.9.
1.1.1.6.9. Analyzing the issue of establishment of regional offices of the National Agency and using the analysis findings to make a justified decision to either establish them or decide that no need for such offices exists
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
7.1.
ESR 1.1.1.7 The results of monitoring and evaluation of the effectiveness of the anticorruption policy are complete, credible, objective, and public
1.1.1.7.1. Drafting and approving the Procedure for Monitoring and Assessing the Implementation of the Anticorruption Strategy and Program
National Agency on Corruption Prevention
The measure was implemented on time and in full
Implemented
100%
14/
14
7.2.
1.1.1.7.2. Conducting the quarterly monitoring of the status of implementation of the Program activities in the manner prescribed by the National Agency
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.3.
1.1.1.7.3. Publishing on the official website of the National Agency the findings of the quarterly monitoring of the status of implementation of the Program activities; after the launch of the information monitoring system, the monitoring findings will be published using this system
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.4.
1.1.1.7.4. Conducting the annual assessment of the progress of achievement of the anticipated strategic results outlined in the Anticorruption Strategy and the Program, in the manner prescribed by the National Agency
National Agency on Corruption Prevention
Not started
7.5.
1.1.1.7.5. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of formulation and implementation of the anticorruption and legal policies with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in Clauses 1 - 3 of this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.6.
1.1.1.7.6. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of justice and activities of law enforcement and prosecutorial authorities with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in Clauses 2 and 3 of this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.7.
1.1.1.7.7. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of regulation of the economy and commerce with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in subclauses 2.2, 2.3, and 2.4 of Clause 2 this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.8.
1.1.1.7.8. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of land relations with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in subclause 2.5 of Clause 2 this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.9.
1.1.1.7.9. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of the customs policy with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in subclause 2.3 of Clause 2 this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.10.
1.1.1.7.10. Organizing two expert surveys (1st quarter of 2024, 1st quarter of 2025) among experts in matters of defense with the objective of assessing the accomplishment of indicators of anticipated strategic results outlined in subclause 2.6 of Clause 2 this appendix
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress
7.11.
1.1.1.7.11. Publishing on the official website of the National Agency the findings of the annual assessment of the progress of accomplishment of the strategic results outlined in the Anticorruption Strategy and Program (after the launch of the information monitoring system, the assessment findings will be published using this system)
National Agency on Corruption Prevention
Not started
7.12.
1.1.1.7.12. Preparing a report on the status of implementation of the Anticorruption Strategy and the Program, indicating the activities completed, the activities currently in progress, and the activities that have not been completed as well as those responsible and the causes of the failure to complete them
National Agency on Corruption Prevention
Not started
7.13.
1.1.1.7.13. Preparing the National Report on the Effectiveness of Implementation of the 2023-2025 State Anticorruption Policy, including the information indicated in Part 3 of Article 20 of the Law
National Agency on Corruption Prevention
Not started
7.14.
1.1.1.7.14. Publishing on the official website of the National Agency the National Report on the Effectiveness of Implementation of the 2023-2025 State Anticorruption Policy and submitting to the Cabinet of Ministers of Ukraine, the Ukrainian Parliament, and the President of Ukraine
National Agency on Corruption Prevention
Not started
8.1.
ESR 1.1.1.8 Anticorruption programs and other program documents of anticorruption nature issued by government agencies, local self-government bodies, and other public institutions are an effective mechanism for overcoming and preventing corrupt practices in the public sector; the public is involved in their development and monitoring
1.1.1.8.1. Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing to amend the Law to:
1) segregate the anticorruption programs of public institutions and legal entities;
2) supplement Article 19 of the Law with an exhaustive list of entities that are obligated to adopt corruption risk management documents in coordination with the National Agency;
3) substitute the powers of the National Agency to analyze anticorruption programs with the powers to submit proposals for corruption risk management documents, the review of which (proposals) is mandatory;
4) define the powers of the National Agency to approve the corruption risk management methodology; carry out strategic analysis of corruption risks in the areas defined by the National Agency and issue proposals based on the analysis findings, the consideration of which is mandatory; monitor the implementation of corruption risk management plans of the entities indicated in Article 19 of the Law;
5) define the corruption risk management role of the head and corruption risk management tasks of anticorruption units (anticorruption officers), according to the methodology approved by the National Agency;
6) abolish the requirement for the National Agency to approve anticorruption programs of the entities indicated in Article 19 of the Law;
7) define the obligation of the entities indicated in Article 19 of the Law to approve corruption risk management documents taking into account the proposals and critical feedback from the National Agency, and also ensure the mandatory implementation of such documents;
8) define the task of anticorruption units (anticorruption officers) to analyze potential and existing contracting parties of the relevant agency using the risk-based approach and submit proposals to the head of this agency;
9) revise the list—in Article 62 of the Law—of business entities obligated to adopt anticorruption programs, particularly by stipulating the obligation to adopt anticorruption programs for all state-owned, municipal enterprises, business companies in which the state-owned or municipal shareholding exceeds 50 percent, commercial entities and business companies in which a 100 percent shareholding (interest) belongs to another business company, or in which a 100 percent shareholding (interest) belongs to the state.
National Agency on Corruption Prevention
Not started
0%
0/
8
8.2.
1.1.1.8.2. Drafting an order of the National Agency to amend the Corruption Risk Management Methodology
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.3.
1.1.1.8.3. Holding a public discussion of the draft order indicated in subclause 1.1.1.8.2, and ensuring its revision (if needed), approval, and submission for state registration
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.4.
1.1.1.8.4. Supporting the state registration of the order indicated in subclause 1.1.1.8.2 and its official publication
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.5.
1.1.1.8.5. Drafting an order of the National Agency to amend the Model Regulation on the Authorized Unit (Authorized Officer) Tasked with the Prevention and Detection of Corruption, specifically by updating the tasks of the authorized unit (authorized officer) in matters of organizing corruption risk management, analyzing potential and existing contracting parties, and submitting the information about them to the head of the relevant agency, annually submitting information about the implementation of activities under the anticorruption program of the relevant agency to the National Agency via the anticorruption portal
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.6.
1.1.1.8.6. Holding a public discussion of the draft order indicated in subclause 1.1.1.8.5, and ensuring its revision (if needed), issuance, and submission for state registration
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.7.
1.1.1.8.7. Supporting the state registration of the order indicated in subclause 1.1.1.8.5 and its official publication
National Agency on Corruption Prevention
Implementation of the measure has not started
Not started
8.8.
1.1.1.8.8. Conducting the annual strategic analysis of corruption risks in priority sectors defined by the National Agency and publishing the findings of this strategic analysis
National Agency on Corruption Prevention
There is progress in the implementation of the measure
In progress