Expected strategic result 2.5.3.6. Easy and quick access to utility and transportation infrastructure has been ensured
Measures — 2
2.5.3.6.1. Supporting the consideration of the Draft Law of Ukraine On Amendments to Select Legislative Acts of Ukraine Pertaining to the Resolution of Specific Issues of Connection to Utility Networks (registration number 5183 dated March 2, 2021) in the Parliament of Ukraine (particularly if the President of Ukraine vetoes the draft law)
The main implementer: Ministry for Communities and Territories Development of Ukraine
2.5.3.6.2.
Drafting and submitting to the Cabinet of Ministers of Ukraine a draft law proposing amendments to select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
1) implemented the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies;
2) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community);
3) identified the procedure for inventory of engineering networks, which simultaneously performs uploading of Urban planning cadaster on the state’s level for further development and update of urban planning documentation;
4) implemented indication of data on engineering networks in Urban planning cadaster on the state’s level, enterprises’ geographic information systems (besides restricted information).
The main implementer: Ministry for Communities and Territories Development of Ukraine
Indicators — 1
A law has taken effect, which has amended select legislative acts of Ukraine pertaining to the resolution of specific issues of connection to utility networks, which:
a) introduces the “one-stop” procedure for providing services involving connection to networks of all entities that are natural monopolies (supply and distribution of electricity and natural gas, heat supply, centralized hot water supply, centralized water supply and centralized wastewater disposal) in order to minimize interactions between the client and entities that are natural monopolies (25 percent);
b) establishes a unified procedure for connecting to utility networks and unified approaches to determining the connection fee (the same price for the service involving connection to utility networks of the same kind is established within the same territorial community) (25 percent)
c) identified the procedure for inventory of engineering networks, which simultaneously performs uploading of Urban planning cadaster on the state’s level for further development and update of urban planning documentation (25 percent);
d) implemented indication of data on engineering networks in Urban planning cadaster on the state’s level, enterprises’ geographic information systems (besides restricted information) (25 percent)