Problem

2.5.10. Imperfection of existing control instruments and lack of transparency of road construction, repair, and maintenance processes

General information about the problem

The national network of public roads is 169,652 kilometers long, and most of them are in poor condition and require repair. This problem has been significantly complicated by the armed aggression of the Russian Federation. According to the draft Recovery Plan for Ukraine, as of June 8, 2022, about 23.9 thousand kilometers of public roads of national importance were damaged as a result of hostilities. At the same time, the flawed nature of existing control tools and insufficient transparency of road construction, repair and maintenance processes can be a significant obstacle to ensuring proper, fast and high-quality road reconstruction in particular and improving the condition of roads in general.
The reasons for the flawed nature of the existing tools for controlling road construction processes include, in particular: insufficient transparency of procurement processes and disclosure of data and procurement information in a suitable (viewable, copyable) format; difficulty in obtaining up-to-date information on the construction, repair and operation of roads; limited access to the results of monitoring of the quality of road works, data on the results of audits, inspections and penalties imposed; inefficient approaches to planning road construction works; inadequate weight and size control.
For these reasons, the processes of road construction, maintenance and repair in Ukraine are not always carried out with integrity, transparency, efficiency and up to standards. This results in poor road quality, repeated work on the same sections, inefficient spending of budget funds, and corruption.
The lack of effective tools for monitoring the quality of road works, planning requirements, and insufficient transparency of processes (failure to ensure proper disclosure of data) in the road sector negatively affects the effectiveness of raising and spending of funds and, as a result, the quality of roads.
Despite the fact that automated dimension and weight control tools (automatic weighing-in-motion (WIM) stations have already been introduced, there is a need to expand and maintain their continuous and uninterrupted operation to ensure proper road maintenance.
In addition, to ensure that consignors and carriers comply with the weight and dimension standards on the roads, it is necessary to ensure that administrative liability for the relevant violations is inevitable.
Expand...

Implementation of SACP measures within the limits of the problem

The total number of OSR – 5
All measures of the SACP
measures, the implementation of which as of 30.09.2024
is about to begin to be completed
4 3 13 10 20
50
Implemented Partially implemented In progress Not implemented Not started
Measures implemented (fully and partially) - 7 (14%)

Deadlines for all measures

01.03.2023 - 31.12.2025

Implementation of SACP measures within the scope of the Problem by main main performers

Ministry for Communities and Territories Development of Ukraine

25%
12

State Agency for Restoration and Infrastructure Development of Ukraine

27.3%
11

Vinnytsia Regional State Administration

0%
1

Volyn regional state administration

0%
1

Dnipropetrovsk Regional State Administration

0%
1

Donetsk regional state administration

0%
1

Achievement of ESR within the limits of the Problem

The total number of OSR – 5

SUMMARIZED GENERAL INFORMATION ON THE IMPLEMENTATION OF THE PROGRAM MEASURES IN TERMS OF DIRECTIONS, PROBLEMS AND EXPECTED STRATEGIC RESULTS

Name of the ESR Name of the measure The main implementer Monitoring results (latest) Performance note % виконаних заходів (fully and partially)
.1.1.(2) ESR 2.5.10.1 With regard to public infrastructure projects, the mandatory publication of all information required by the Law of Ukraine On the Openness of Spending of Public Funds and data disclosure in accordance with CoST IDS (Infrastructure Data Standard) and publication of data (including design documentation and methodology for calculating the anticipated cost of procurement) in a machine-readable format in accordance with OC4IDS and OCDS standards 2.5.10.1.1.(2) Arranging the publication of the entire array of data defined in Part 1 of Article 3 of the Law of Ukraine On the Openness of Spending of Public Fund on road infrastructure projects on the Unified Web Portal on the Spending of Public Funds, particularly with respect to: 1) the administrator (recipient) of budget funds (name, identification code of the legal entity, address, last name, first name and patronymic of the manager); 2) the chief administrator of budget funds (name, address, last name, first name and patronymic of the manager); 3) the amount of budget allocations and/or budget subsidies for the relevant budget periods — total amount and broken down by budgetary programs; 4) the amount of budget expenditures and loans extended from the budget during the reporting period — total amount and broken down by budgetary programs (this must also include a listing of the kinds and amounts of the relevant revenue streams with respect to funds of the special fund of the budget); 5) information about contracts concluded during the reporting period (the subject matter of the contract, the contractor (name, identification code of legal entity, place of business address), the contract price, the unit price (if any), the quantity of goods, work and/or services purchased, whether or not the procurement process was held and, if not, the grounds for skipping the procurement process with a reference to the law, the amount of payments made under the contract during the reporting period, and the effective term of the contract); 6) information about the status of performance of contracts signed in previous reporting periods, with all appendices forming an integral part of such contracts (the subject matter of the contract, the contractor (name, identification code of legal entity, place of business address, last name, first name and patronymic of the manager), the contract price, the unit price (if any), whether or not the procurement process was held and, if not, the grounds for skipping the procurement process with a reference to the law, the amount of payments made under the contract during the reporting period, whether or not there have been any claims or penalties arising out of the performance of the contract, certificates of delivery and acceptance (certificates of services rendered, certificates of delivery and acceptance, performance of work), if any); 7) the number of business trips, including the number of business trips abroad, the total amount spent on business trips, including the amount spent on business trips abroad. Ministry for Communities and Territories Development of Ukraine The measure was implemented on time and in full Implemented
200% 58/ 29
.1.1.(1) 2.5.10.1.1.(1) Arranging the publication of the entire array of data defined in Part 1 of Article 3 of the Law of Ukraine On the Openness of Spending of Public Fund on road infrastructure projects on the Unified Web Portal on the Spending of Public Funds, particularly with respect to: 1) the administrator (recipient) of budget funds (name, identification code of the legal entity, address, last name, first name and patronymic of the manager); 2) the chief administrator of budget funds (name, address, last name, first name and patronymic of the manager); 3) the amount of budget allocations and/or budget subsidies for the relevant budget periods — total amount and broken down by budgetary programs; 4) the amount of budget expenditures and loans extended from the budget during the reporting period — total amount and broken down by budgetary programs (this must also include a listing of the kinds and amounts of the relevant revenue streams with respect to funds of the special fund of the budget); 5) information about contracts concluded during the reporting period (the subject matter of the contract, the contractor (name, identification code of legal entity, place of business address), the contract price, the unit price (if any), the quantity of goods, work and/or services purchased, whether or not the procurement process was held and, if not, the grounds for skipping the procurement process with a reference to the law, the amount of payments made under the contract during the reporting period, and the effective term of the contract); 6) information about the status of performance of contracts signed in previous reporting periods, with all appendices forming an integral part of such contracts (the subject matter of the contract, the contractor (name, identification code of legal entity, place of business address, last name, first name and patronymic of the manager), the contract price, the unit price (if any), whether or not the procurement process was held and, if not, the grounds for skipping the procurement process with a reference to the law, the amount of payments made under the contract during the reporting period, whether or not there have been any claims or penalties arising out of the performance of the contract, certificates of delivery and acceptance (certificates of services rendered, certificates of delivery and acceptance, performance of work), if any); 7) the number of business trips, including the number of business trips abroad, the total amount spent on business trips, including the amount spent on business trips abroad. State Agency for Restoration and Infrastructure Development of Ukraine The measure was implemented on time and in full Implemented
.1.2. 2.5.10.1.2. Drafting and issuing an order of the National Agency for Rebuilding and Development of Infrastructure, which regulates the matter of publication of public information in the form of open data, which—according to the Regulation on Data Sets Subject to Publication in the Form of Open Data, approved by the resolution of the Cabinet of Ministers of Ukraine dated October 21, 2015, No. 835—are subject to publication in the form of open data by the National Agency for Rebuilding and Development of Infrastructure and by regional state administrations. Information about road infrastructure projects is subject to disclosure in accordance with CoST IDS (Infrastructure Data Standard), and data (particularly design documentation and methods of calculation of the anticipated cost of procurement) is published in machine-readable format in accordance with the OC4IDS and OCDS standards. State Agency for Restoration and Infrastructure Development of Ukraine The measure was implemented late and partially Partially implemented
.1.3.(24) 2.5.10.1.3.(24) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Chernihiv Regional State Administration There is progress in the implementation of the measure In progress
.1.3.(26) 2.5.10.1.3.(26) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Khmelnytskyi regional state administration Implementation of the measure has not started Not started
.1.3.(1) 2.5.10.1.3.(1) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards State Agency for Restoration and Infrastructure Development of Ukraine There is progress in the implementation of the measure In progress
.1.3.(25) 2.5.10.1.3.(25) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Kyiv City State Administration Implementation of the measure has not started Not started
.1.3.(23) 2.5.10.1.3.(23) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Chernivtsi regional state administration There is progress in the implementation of the measure In progress
.1.3.(22) 2.5.10.1.3.(22) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Cherkasy regional state administration Implementation of the measure has not started Not started
.1.3.(21) 2.5.10.1.3.(21) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Kherson regional state administration Implementation of the measure has not started Not started
.1.3.(20) 2.5.10.1.3.(20) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Kharkiv Regional State Administration Implementation of the measure has not started Not started
.1.3.(19) 2.5.10.1.3.(19) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Ternopil Regional State Administration Implementation of the measure has not started Not started
.1.3.(18) 2.5.10.1.3.(18) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Sumy regional state administration There is progress in the implementation of the measure In progress
.1.3.(17) 2.5.10.1.3.(17) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Rivne Regional State Administration Implementation of the measure has not started Not started
.1.3.(16) 2.5.10.1.3.(16) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Poltava Regional State Administration Implementation of the measure has not started Not started
.1.3.(15) 2.5.10.1.3.(15) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Odesa Regional State Administration Implementation of the measure has not started Not started
.1.3.(5) 2.5.10.1.3.(5) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Donetsk regional state administration Implementation of the measure has not started Not started
.1.3.(14) 2.5.10.1.3.(14) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Mykolaiv Regional State Administration Implementation of the measure has not started Not started
.1.3.(2) 2.5.10.1.3.(2) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Vinnytsia Regional State Administration There is no progress in the implementation of the measure In progress
.1.3.(3) 2.5.10.1.3.(3) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Volyn regional state administration There is no progress in the implementation of the measure In progress
.1.3.(4) 2.5.10.1.3.(4) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Dnipropetrovsk Regional State Administration Implementation of the measure has not started Not started
.1.3.(6) 2.5.10.1.3.(6) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Zhytomyr Regional State Administration Implementation of the measure has not started Not started
.1.3.(7) 2.5.10.1.3.(7) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Transcarpathian regional state administration There is no progress in the implementation of the measure In progress
.1.3.(8) 2.5.10.1.3.(8) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Zaporizhzhia regional state administration Implementation of the measure has not started Not started
.1.3.(9) 2.5.10.1.3.(9) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Ivano-Frankivsk Regional State Administration There is progress in the implementation of the measure In progress
.1.3.(10) 2.5.10.1.3.(10) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Kyiv regional state administration Implementation of the measure has not started Not started
.1.3.(11) 2.5.10.1.3.(11) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Kirovohrad Regional State Administration Implementation of the measure has not started Not started
.1.3.(12) 2.5.10.1.3.(12) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Luhansk regional state administration Implementation of the measure has not started Not started
.1.3.(13) 2.5.10.1.3.(13) Performance by the National Agency for Rebuilding and Development of Infrastructure and regional state administrations all of the requirements of the order indicated in subclause 2.5.10.1.2, and ensuring the publication of open data on the Unified State Web Portal of Open Data in accordance with the list of data sets per CoST IDS (Infrastructure Data Standard), publication of data (particularly design documentation and methodology of calculation of the anticipated cost of procurement) in machine-readable format in accordance with the OC4IDS and OCDS standards Lviv Regional State Administration There is no progress in the implementation of the measure In progress
.2.1. ESR 2.5.10.2 The results of monitoring of the quality of road works, audit findings, and penalties are published on the official website of the initiator of the audit, or the entity that initiated or paid for the monitoring 2.5.10.2.1. Drafting the order of the Ministry of Infrastructure on approval of the procedure for monitoring the quality of work, particularly work involving the rebuilding (modernization) of Ukraine, and forms of the model contract on the monitoring of the quality of work Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
0% 0/ 7
.2.2. 2.5.10.2.2. Holding a public discussion of the draft order indicated in subclause 2.5.10.2.1, and ensuring its revision (if needed) Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
.2.3. 2.5.10.2.3. Issuing the order of the Ministry of Infrastructure on approval of the procedure for monitoring the quality of work, particularly work involving the rebuilding (modernization) of Ukraine, and forms of the model contract on the monitoring of the quality of work Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
.2.4. 2.5.10.2.4. Developing an online platform for gathering and publishing open data on the monitoring of the quality of work, particularly work involving the rebuilding (modernization) of Ukraine (such as reports on the monitoring of the progress of construction, retrofitting, renovations with all appendices, including protocols, inspection reports, and materials sampling reports) Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
.2.5. 2.5.10.2.5. Conducting pilot operation of the online platform indicated in subclause 2.5.10.2.4, and making adjustments (if necessary) Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
.2.6. 2.5.10.2.6. Putting the online platform indicated in subclause 2.5.10.2.4 into commercial operation. Ministry for Communities and Territories Development of Ukraine Implementation of the measure has not started Not started
.2.7. 2.5.10.2.7. Using the online platform to openly publish the current results of the monitoring of the quality of work, including work involving the rebuilding (modernization) of Ukraine (such as reports on the monitoring of the progress of construction, retrofitting, renovations with all appendices, including protocols, inspection reports, and materials sampling reports) Ministry for Communities and Territories Development of Ukraine Implementation of the measure has not started Not started
.3.1. ESR 2.5.10.3 An open map of road construction, repair, and maintenance has been created, which displays the tenders held and contracts signed for such work in order to avoid overlapping operations at the same sites; this map has been integrated with the Unified State Electronic System in Construction 2.5.10.3.1. Developing and signing documentation for the implementation of the tool for digital management of the rebuilding (modernization) of Ukraine, which will ensure public access to an interactive map of projects, including those involving the rebuilding (modernization) of Ukraine, with information about competitive bidding processes completed, contracts signed, contractors and current progress of construction all over Ukraine, making it possible to monitor the progress of renovations and construction and avoid overlapping operations at the same sites Ministry for Communities and Territories Development of Ukraine The measure was not implemented on time and in full Implemented
100% 5/ 5
.3.2. 2.5.10.3.2. Conducting pilot operation of the digital management tool indicated in subclause 2.5.10.3.1, adjusting it (if needed), and putting it into commercial operation. Ministry for Communities and Territories Development of Ukraine The measure was implemented on time, but partially Partially implemented
.3.3. 2.5.10.3.3. Ensuring constant operation (with public access) and updating of the interactive map of projects, particularly projects to rebuild (modernize) Ukraine, with information about competitive bidding processes completed, contracts signed, contractors and current progress of construction all over Ukraine, making it possible to monitor the progress of repairs and construction Ministry for Communities and Territories Development of Ukraine Implementation of the measure has started on time In progress
.3.4. 2.5.10.3.4. Developing technical documentation for integration of the interactive map of projects, including projects to rebuild (modernize) Ukraine, with the Unified State Electronic System in Construction Ministry for Communities and Territories Development of Ukraine The measure has not been implemented Not implemented
.3.5. 2.5.10.3.5. Conducting pilot operation and performing the commercial launch of the interactive map of projects, including projects to rebuild (modernize) Ukraine, integrated with the Unified State Electronic System in Construction State Agency for Restoration and Infrastructure Development of Ukraine Not started
.4.1. ESR 2.5.10.4 Requirements have been introduced to ensure that all road construction works are planned based on the results of instrument-assisted surveys 2.5.10.4.1. Drafting and issuing the order of the Ministry of Infrastructure on approval of State Standard of Ukraine DSTU ХХХХ:20ХХ “Motor Roads. Rules for Scheduling Repairs”, which sets forth the requirements applicable to the planning of all road construction operations, taking into account the results of instrument-assisted surveys State Enterprise “Ukrainian Research and Training Center for Problems of Standardization, Certification and Quality” The measure was implemented on time and in full Implemented
100% 6/ 6
.4.2. 2.5.10.4.2. Drafting an order of the Ministry of Infrastructure on approval of the algorithm (procedure, methodology) of instrument-assisted surveys of the condition of motor roads and selection of road segments for repairs (sequence) State Agency for Restoration and Infrastructure Development of Ukraine The measure has not been implemented Not implemented
.4.3. 2.5.10.4.3. Holding a public discussion of the draft order indicated in subclause 2.5.10.4.2, and ensuring its revision (if needed) State Agency for Restoration and Infrastructure Development of Ukraine The measure has not been implemented Not implemented
.4.4. 2.5.10.4.4. Issuing the order indicated in subclause 2.5.10.4.2 State Agency for Restoration and Infrastructure Development of Ukraine The measure has not been implemented Not implemented
.4.5. 2.5.10.4.5. Developing and implementing a data storage system with the functionality for automatic selection (prioritization) of motor roads for the purposes of planning road repairs based on data of instrument-assisted surveys State Agency for Restoration and Infrastructure Development of Ukraine The measure has not been implemented Not implemented
.4.6. 2.5.10.4.6. Gathering data based on the results of instrument-assisted surveys of motor roads, which are used to plan road construction work with the help of the system indicated in subclause 2.5.10.4.5 State Agency for Restoration and Infrastructure Development of Ukraine There is progress in the implementation of the measure In progress
.5.1. ESR 2.5.10.5 Round-the-clock comprehensive automated dimensional and weight control has been implemented; administrative liability for consignors and carriers for exceeding the dimensional and weight parameters has been established; information on violations of dimensional and weight parameters and sanctions imposed is published on the official website of the State Service of Ukraine for Transport Safety 2.5.10.5.1. Ensuring the operation of all WIM systems deployed on motor roads, including repairs of WIM systems that are out of order State Agency for Restoration and Infrastructure Development of Ukraine The measure was implemented on time, but partially Partially implemented
0% 0/ 3
.5.2. 2.5.10.5.2. Certificates of entry into operation have been signed, and at least 45 new WIM systems are functioning. State Agency for Restoration and Infrastructure Development of Ukraine There is progress in the implementation of the measure In progress
.5.3. 2.5.10.5.3. Publication on the official website of the State Service of Ukraine for Transport Safety of information about violations of dimension and weight limits as well as sanctions imposed for the relevant violations, particularly administrative penalties State Service of Ukraine for Transport Safety There is progress in the implementation of the measure In progress

Key sources on the state of the problem:

Assessment of the situation by international monitoring mechanisms and organizations: